NASA Media Archive

KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3230

KSC | 2003-12-16

Details
KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3232

KSC | 2003-12-16

Details
KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3233

KSC | 2003-12-16

Details
KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3238

KSC | 2003-12-16

Details
KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3231

KSC | 2003-12-16

Details
Kaleri works on the SKV-2 AC in the SM during Expedition 8

iss008e08615

JSC | 2003-12-16

Details
KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

KSC-03pd3236

KSC | 2003-12-16

Details
Mars Exploration Rover, Vertical Artist Concept

PIA04928

JPL | 2003-12-15

Details
Solar Storms, Devils, Dunes, and Gullies

PIA04932

JPL | 2003-12-13

Details
Clouds Near Mie Crater

PIA04930

JPL | 2003-12-13

Details
Mars South Polar Layered Deposits

PIA04931

JPL | 2003-12-13

Details
Gullies in Crater in Hellas

PIA04929

JPL | 2003-12-13

Details
Voyager Approaches Final Frontier Artist Concept

PIA04927

JPL | 2003-12-12

Details
Globular Cluster Messier 2 in Aquarius

PIA04926

JPL | 2003-12-11

Details
Stephan Quintet and NGC 7331

PIA04925

JPL | 2003-12-10

Details
Airborne Dust and Ash over Southern California

PIA04348

JPL | 2003-12-10

Details
Galaxy NGC 300

PIA04924

JPL | 2003-12-10

Details
Galaxy NGC 55

PIA04923

JPL | 2003-12-10

Details
Galaxy NGC 247

PIA04922

JPL | 2003-12-10

Details
Andromeda Galaxy

PIA04921

JPL | 2003-12-10

Details
Layers in Tithonium

PIA04920

JPL | 2003-12-10

Details
Wind-Eroded Terrain near Olympus Mons

PIA04919

JPL | 2003-12-10

Details
Small Dust Storm in Syria/Claritas

PIA04914

JPL | 2003-12-10

Details
Troughs in Tempe Terra

PIA04915

JPL | 2003-12-10

Details
Mars Reconnaissance Orbiter over Pole Artist Concept

PIA04918

JPL | 2003-12-10

Details
Mars Reconnaissance Orbiter Aerobraking Artist Concept

PIA04917

JPL | 2003-12-10

Details
Mars Reconnaissance Orbiter over Nilosyrtis Artist Concept

PIA04916

JPL | 2003-12-10

Details
Crater in Marte Vallis

PIA04912

JPL | 2003-12-10

Details
View of the Full Moon taken during Expedition 8

iss008e08453

JSC | 2003-12-10

Details
Official Photograph of Astronaut Wendy Lawrence

JSC2004e00590

JSC | 2003-12-10

Details
View of the Full Moon taken during Expedition 8

iss008e08451

JSC | 2003-12-10

Details
Official Photograph of Astronaut Charles Camarda

JSC2004e00591

JSC | 2003-12-10

Details
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, KSC employee Duane Williams prepares the blanket insulation to be installed on the body flap on orbiter Discovery. The blankets are part of the Orbiter Thermal Protection System, thermal shields to protect against temperatures as high as 3,000° Fahrenheit, which are produced during descent for landing. Discovery is scheduled to fly on mission STS-121 to the International Space Station.

KSC-03pd3219

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, KSC employee Duane Williams prepares the blanket insulation to be installed on the body flap on orbiter Discovery. The blankets are part of the Orbiter Thermal Protection System, thermal shields to protect against temperatures as high as 3,000° Fahrenheit, which are produced during descent for landing. Discovery is scheduled to fly on mission STS-121 to the International Space Station.

KSC-03pd3220

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, KSC employees help guide the destacking of the forward assembly (nose cap and frustum) from a solid rocket booster (SRB) after the bolts were removedThe destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.

KSC-03pd3225

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, the forward assembly (nose cap and frustum) is moved away from the solid rocket booster (SRB). The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.

KSC-03pd3226

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, after being removed from the solid rocket booster (SRB), the forward assembly is lowered from high above the transfer aisle. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.

KSC-03pd3228

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, KSC employee Gene Peavler works in the wheel area on the orbiter Discovery. The vehicle has undergone Orbiter Major Modifications in the past year. Discovery is scheduled to fly on mission STS-121 to the International Space Station.

KSC-03pd3214

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, a KSC employee loosens a bolt on part of the forward assembly of a solid rocket booster (SRB) before destacking. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The destacking is part of time and cycle activities. STS-114 is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.

KSC-03pd3222

KSC | 2003-12-09

Details
KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building, a KSC employee separates the forward assembly (nose cap and frustum) from a solid rocket booster (SRB) after the bolts were removed. The destacking is part of time and cycle activities. The SRB was part of the stack on Atlantis originally scheduled for a March 1, 2003, launch on mission STS-114. The SRBs and external tank were demated in February 2003. The mission is now scheduled to occur no earlier than Sept. 12, 2004, on Atlantis.

KSC-03pd3224

KSC | 2003-12-09

Details