NASA Media Archive

Robonaut activities involving joint task operations with a EVA suited astronaut

jsc2003-00302

JSC | 2003-06-17

Details
KENNEDY SPACE CENTER, FLA. - Workers on Launch Pad 17-B, Cape Canaveral Air Force Station, complete mating of the Mars Exploration Rover 1 (MER-B), above, to the Delta rocket below. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1965

KSC | 2003-06-17

Details
KENNEDY SPACE CENTER, FLA. - On Launch Pad 17-B, Cape Canaveral Air Force Station, the Mars Exploration Rover 1 (MER-B) is lowered toward the Delta rocket for mating. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1964

KSC | 2003-06-17

Details
KENNEDY SPACE CENTER, FLA. - The canister is lifted off the Mars Exploration Rover 1 (MER-B) in the gantry on Launch Complex 17-B, Cape Canaveral Air Force Station. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1967

KSC | 2003-06-17

Details
KENNEDY SPACE CENTER, FLA. - On Launch Pad 17-B, Cape Canaveral Air Force Station, the Mars Exploration Rover 1 (MER-B) is lifted up the tower for mating with the Delta rocket. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1960

KSC | 2003-06-17

Details
Robonaut joint task operations with astronaut Nancy Currie.

jsc2003e42632

JSC | 2003-06-17

Details
Robonaut joint task operations with astronaut Nancy Currie.

jsc2003e42601

JSC | 2003-06-17

Details
Robonaut joint task operations with astronaut Nancy Currie.

jsc2003e42603

JSC | 2003-06-17

Details
Richardson Dunes in Summer

PIA04575

JPL | 2003-06-16

Details
Sand Dunes of Schaeberle Crater

PIA04573

JPL | 2003-06-16

Details
Daedalia Lava Flow Margin

PIA04574

JPL | 2003-06-16

Details
Frosted Chasma Boreale Dunes

PIA04572

JPL | 2003-06-16

Details
Earth Observations taken by the Expedition Seven crew

iss007e07360

JSC | 2003-06-14

Details
Earth Observations taken by the Expedition Seven crew

iss007e07388

JSC | 2003-06-14

Details
KENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, the cylindrical payload canister is lowered around Mars Exploration Rover 1 (MER-B). Once secure inside the canister, the rover will be transported to Launch Complex 17-B, Cape Canaveral Air Force Station, for mating with the Delta rocket. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch from Pad 17-B June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1936

KSC | 2003-06-13

Details
Official Portrait of Astronaut Rex J. Walheim.

JSC2003e47248

JSC | 2003-06-13

Details
KENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers secure the cylindrical payload canister to the lower panels surrounding Mars Exploration Rover 1 (MER-B). Once secure inside the canister, the rover will be transported to Launch Complex 17-B, Cape Canaveral Air Force Station, for mating with the Delta rocket. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch from Pad 17-B June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1938

KSC | 2003-06-13

Details
KSC-07pd3284

KSC-07pd3284

KSC | 2003-06-13

Details
MER-B

KSC-03pd1935

KSC | 2003-06-13

Details
Earth Observations taken by the Expedition Seven crew

iss007e07247

JSC | 2003-06-13

Details
Earth Observations taken by the Expedition Seven crew

iss007e07304

JSC | 2003-06-13

Details
Earth Observations taken by the Expedition Seven crew

iss007e07306

JSC | 2003-06-13

Details
KENNEDY SPACE CENTER, FLA. - In the Payload Hazardous Servicing Facility, workers maneuver the cylindrical payload canister into place around Mars Exploration Rover 1 (MER-B). Once secure inside the canister, the rover will be transported to Launch Complex 17-B, Cape Canaveral Air Force Station, for mating with the Delta rocket. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch from Pad 17-B June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1937

KSC | 2003-06-13

Details
KENNEDY SPACE CENTER, FLA. - Workers in the Payload Hazardous Servicing Facility secure the lower panels of a payload canister around Mars Exploration Rover 1 (MER-B). The rover will be transported to Launch Complex 17-B, Cape Canaveral Air Force Station, for mating with the Delta rocket. The second of twin rovers being sent to Mars, it is equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow it to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans can't yet go. MER-B is scheduled to launch from Pad 17-B June 26 at one of two available times, 12:27:31 a.m. EDT or 1:08:45 a.m. EDT.

KSC-03pd1934

KSC | 2003-06-13

Details
Gullies in Crater Wall

PIA04570

JPL | 2003-06-12

Details
Layered Yardangs in Henry Crater

PIA04571

JPL | 2003-06-12

Details
Frost in Charitum Montes

PIA04569

JPL | 2003-06-12

Details
Tractus Catena Collapse Pits

PIA04568

JPL | 2003-06-12

Details
Layers in Galle Crater

PIA04567

JPL | 2003-06-12

Details
South Polar Cap in Summer

PIA04566

JPL | 2003-06-12

Details
Terrain Near Gordii Dorsum

PIA04565

JPL | 2003-06-12

Details
Cycloidal Dust Devil Track

PIA04564

JPL | 2003-06-12

Details
Clouds Over Morning Limb

PIA04562

JPL | 2003-06-12

Details
Small Martian Mesa

PIA04563

JPL | 2003-06-12

Details
Destination: Gusev

PIA04561

JPL | 2003-06-12

Details
Dalmatian Terrain

PIA04560

JPL | 2003-06-12

Details
Masursky Crater

PIA04559

JPL | 2003-06-12

Details
Lycus Sulci

PIA04558

JPL | 2003-06-12

Details
Bizarre Crater Mound

PIA04557

JPL | 2003-06-12

Details
Chaotic Terrain

PIA04556

JPL | 2003-06-12

Details