NASA Media Archive

KSC-97pc197

KSC-97pc197

KSC | 1997-01-22

Details
KSC-97pc209

KSC-97pc209

KSC | 1997-01-22

Details
KSC-97pc189

KSC-97pc189

KSC | 1997-01-22

Details
KENNEDY SPACE CENTER, FLA. - STS-82 Mission Specialist Gregory J. Harbaugh, at top, inspects part of the Flight Support System during the Crew Equipment Integration Test (CEIT) at KSC's Vertical Processing Facility. Harbaugh and the other six STS-82 crew members will conduct the second Hubble Space Telescope (HST) servicing mission aboard the Space Shuttle Discovery. Harbaugh will be one of four spacewalkers. Liftoff aboard Discovery is scheduled Feb. 11.

KSC-97pc202

KSC | 1997-01-22

Details
KSC-97pc198

KSC-97pc198

KSC | 1997-01-22

Details
KSC-97pc191

KSC-97pc191

KSC | 1997-01-22

Details
KSC-97pc193

KSC-97pc193

KSC | 1997-01-22

Details
KSC-97pc210

KSC-97pc210

KSC | 1997-01-22

Details
KSC-97pc196

KSC-97pc196

KSC | 1997-01-22

Details
KENNEDY SPACE CENTER, FLA. - STS-82 crew members and workers at KSC's Vertical Processing Facility look at hardware in the Multipurpose ORU (Orbital Replacement Unit) Protective Enclsoure, also called MOPE. The crew is participating in the Crew Equipment Integration Test (CEIT). Liftoff of STS-82, the second Hubble Space Telescope (HST) servicing mission, is scheduled Feb. 11 aboard Discovery with a crew of seven.

KSC-97pc205

KSC | 1997-01-22

Details
The landing of STS-81 Atlantis, OV-104, on a runway at KSC's SLF

sts081-s-008

JSC | 1997-01-22

Details
KSC-97pc190

KSC-97pc190

KSC | 1997-01-22

Details
KSC-97pc194

KSC-97pc194

KSC | 1997-01-22

Details
KENNEDY SPACE CENTER, FLA. - In KSC's Vertical Processing Facility, Louise Kleba of the Vehicle Integration Test Team (VITT) and engineer Devin Tailor of Goddard Space Flight Center examine the Pistol Grip Tool (PGT), which was designed for use by astronauts during spacewalks. The PGT is a self-contained, micro-processor controlled, battery-powered tool. It also can be used as a nonpowered ratchet wrench. The experiences of the astronauts on the first Hubble Space Telescope (HST) servicing mission led to recommendations for this smaller, more efficient tool for precision work during spacewalks. The PGT will be used on the second HST servicing mission, STS-82. Liftoff aboard Discovery is scheduled Feb. 11.

KSC-97pc203

KSC | 1997-01-22

Details
The landing of STS-81 Atlantis, OV-104, on a runway at KSC's SLF

sts081-s-010

JSC | 1997-01-22

Details
KSC-97pc188

KSC-97pc188

KSC | 1997-01-22

Details
KSC-97pc183

KSC-97pc183

KSC | 1997-01-21

Details
KSC-97pc185

KSC-97pc185

KSC | 1997-01-21

Details
KSC-97pc184

KSC-97pc184

KSC | 1997-01-21

Details
KSC-97pc187

KSC-97pc187

KSC | 1997-01-21

Details
Earth observations taken during STS-81 mission

sts081-711-009

JSC | 1997-01-21

Details
KSC-97pc182

KSC-97pc182

KSC | 1997-01-20

Details
KSC-97pc180

KSC-97pc180

KSC | 1997-01-20

Details
Survey views of the Mir space station taken after undocking

sts081-736-034

JSC | 1997-01-20

Details
View of the Mir space station taken after undocking

sts081-701-012

JSC | 1997-01-20

Details
KSC-97pc181

KSC-97pc181

KSC | 1997-01-20

Details
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lift the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) prior to its installation in the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

KSC-97pc172

KSC | 1997-01-18

Details
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility inspect the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) on its handling fixture. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

KSC-97pc171

KSC | 1997-01-18

Details
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lower the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) into the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

KSC-97pc169

KSC | 1997-01-18

Details
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility make final prelaunch prepartions to various payload elements that are part of the second Hubble Space Telescope (HST) servicing mission, STS-82. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

KSC-97pc170

KSC | 1997-01-18

Details
KENNEDY SPACE CENTER, FLA. - The Space Shuttle Discovery on its Mobile Launcher Platform makes its slow 3.4-mile trek from the Vehicle Assembly Building to Launch Pad 39A in preparation for the STS-82 mission. In the foreground is the U.S. flag at the Press Site area. A seven-member crew will perform the second servicing of the orbiting Hubble Space Telescope (HST) during the 10-day STS-82 mission, which is targeted for a Feb. 11 liftoff.

KSC-97pc168

KSC | 1997-01-17

Details
ARC-1997-AC97-0015-10

ARC-1997-AC97-0015-10

ARC | 1997-01-17

Details
KENNEDY SPACE CENTER, FLA. - United Space Alliance (USA) workers J.D. Wise, left, and Robert Shackelford, with drill, try to stop an approximately 24-foot-long crack from getting any bigger on the Mobile Launcher Platform (MLP), which is holding the Space Shuttle Discovery en route to Launch Pad 39A for the STS-82 mission. Discovery was on its way out to the launch pad when engineers heard a loud bang and noticed that a crack had developed on the MLP. Rollout had begun shortly after 7 a.m. EST and was stopped at about 8:25 a.m. This Y-shaped crack is on the MLP surface and runs from near the left-hand solid rocket booster flame hole toward the near corner of the MLP. Rollout of Discovery resumed just past noon after structural engineers determined that the integrity of the MLP had not been compromised. Discovery is scheduled to lift off on the second Hubble Space Telescope servicing mission on Feb. 11.

KSC-97pc163

KSC | 1997-01-17

Details
KENNEDY SPACE CENTER, FLA. - Robert T. Nelson of KSC Security points to an approximately 24-foot-long crack on the Mobile Launcher Platform (MLP), which is holding the Space Shuttle Discovery en route to Launch Pad 39A for the STS-82 mission. Nelson was riding on the MLP when he heard a loud noise and noticed the crack. Rollout had begun shortly after 7 a.m. EST and was stopped at about 8:25 a.m. This Y-shaped crack is on the MLP surface and runs from near the left-hand solid rocket booster flame hole toward the near corner of the MLP. Rollout of Discovery resumed just past noon after structural engineers determined that the integrity of the MLP had not been compromised. Discovery is scheduled to lift off on the second Hubble Space Telescope servicing mission on Feb. 11.

KSC-97pc162

KSC | 1997-01-17

Details
ARC-1997-AC97-0015-12

ARC-1997-AC97-0015-12

ARC | 1997-01-17

Details
ARC-1997-AC97-0015-2

ARC-1997-AC97-0015-2

ARC | 1997-01-17

Details
ARC-1997-AC97-0015-1

ARC-1997-AC97-0015-1

ARC | 1997-01-17

Details
ARC-1997-AC97-0015-15

ARC-1997-AC97-0015-15

ARC | 1997-01-17

Details
Crew portrait of the STS-81 and Mir 22 crew on Atlantis

s81e5535

JSC | 1997-01-17

Details
KENNEDY SPACE CENTER, FLA. - After leaving the Vehicle Assembly Building, the Space Shuttle Discovery makes its slow - up to 1 mile per hour - trek along the crawlerway to Launch Pad 39A in preparation for the STS-82 mission. The Shuttle is assembled on a Mobile Launcher Platform, seen in this view taken from above, and the entire assemblage is carried out to the launch pad on the crawler transporter, which is underneath the MLP. A seven-member crew will perform the second servicing of the orbiting Hubble Space Telescope (HST) during the 10-day STS-82 mission, which is targeted for a Feb. 11 liftoff.

KSC-97pc161

KSC | 1997-01-17

Details